Sunday, 30 October 2011

What we did today...


We have already cleared all the perennial weeds from around the polytunnel, fixed gravel boards along the outside, lined the gap between the boards and the tunnel with black polythene and filled this with shingle to  prevent any weeds growing close to the tunnel walls and to allow the areas around the tunnel to be strimmed without damaging the walls.

This is what we did today :
  • Attached a mesh screen to the back doorway of the polytunnel.
  • Hung a polythene blind at the back doorway to raise/lower as temperature dictates.
  •  Rebuilt the front door and re-covered it in UV stabilised polythene sheeting.
On Wednesday, the door will be hung and we will then concentrate our efforts on preparing the allotment beds, leaving the remaining work inside the polytunnel for those cold and rainy days when it is not possible to work outside.
.

No comments: